WEKO3
アイテム
{"_buckets": {"deposit": "bd57f6a6-6c97-4ca1-80de-a33a4400c772"}, "_deposit": {"id": "6636", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "6636"}, "status": "published"}, "_oai": {"id": "oai:kitami-it.repo.nii.ac.jp:00006636", "sets": ["41"]}, "item_2_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "1989-03", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "2", "bibliographicPageEnd": "80", "bibliographicPageStart": "71", "bibliographicVolumeNumber": "20", "bibliographic_titles": [{"bibliographic_title": "北見工業大学研究報告"}]}]}, "item_2_description_14": {"attribute_name": "フォーマット", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "An outline of already reported scheduling methods which can satisfy environmental constraints and give maximum reliability is briefly described. This scheduling method is expanded to consider the minimum shut-down time of the thermal power units in this paper. To satisfy a constraint of the minimum shut-down time, start-stop schedules are modified to improve themselves so that the thermal units at least shut-down during the minimum shut-down time, or not shut-down at all. Using simulation results of a model power system, an usefulness of the proposed method is shown. Variations of the power supply probability and the computing time are investigated.", "subitem_description_type": "Abstract"}]}, "item_2_publisher_32": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "北見工業大学"}]}, "item_2_select_15": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Yoichi, NAKAMURA"}], "nameIdentifiers": [{"nameIdentifier": "33337", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Susumu, YAMASHIRO"}], "nameIdentifiers": [{"nameIdentifier": "33338", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-11-22"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "20-2-1.pdf", "filesize": [{"value": "4.3 MB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 4300000.0, "url": {"label": "20-2-1.pdf", "url": "https://kitami-it.repo.nii.ac.jp/record/6636/files/20-2-1.pdf"}, "version_id": "b32db9c8-1fa6-4b1f-a8a3-b6fd4b19e745"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-"}]}, "item_type_id": "2", "owner": "1", "path": ["41"], "permalink_uri": "https://kitami-it.repo.nii.ac.jp/records/6636", "pubdate": {"attribute_name": "公開日", "attribute_value": "2007-04-09"}, "publish_date": "2007-04-09", "publish_status": "0", "recid": "6636", "relation": {}, "relation_version_is_last": true, "title": ["Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-"], "weko_shared_id": 3}
Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-
https://kitami-it.repo.nii.ac.jp/records/6636
https://kitami-it.repo.nii.ac.jp/records/66367f500188-ee89-4ea1-bb53-41b8e8f53089
名前 / ファイル | ライセンス | アクション |
---|---|---|
20-2-1.pdf (4.3 MB)
|
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2007-04-09 | |||||
タイトル | ||||||
タイトル | Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints- | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源 | http://purl.org/coar/resource_type/c_6501 | |||||
タイプ | departmental bulletin paper | |||||
著者 |
Yoichi, NAKAMURA
× Yoichi, NAKAMURA× Susumu, YAMASHIRO |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | An outline of already reported scheduling methods which can satisfy environmental constraints and give maximum reliability is briefly described. This scheduling method is expanded to consider the minimum shut-down time of the thermal power units in this paper. To satisfy a constraint of the minimum shut-down time, start-stop schedules are modified to improve themselves so that the thermal units at least shut-down during the minimum shut-down time, or not shut-down at all. Using simulation results of a model power system, an usefulness of the proposed method is shown. Variations of the power supply probability and the computing time are investigated. | |||||
書誌情報 |
北見工業大学研究報告 巻 20, 号 2, p. 71-80, 発行日 1989-03 |
|||||
フォーマット | ||||||
内容記述タイプ | Other | |||||
内容記述 | application/pdf | |||||
著者版フラグ | ||||||
値 | publisher | |||||
出版者 | ||||||
出版者 | 北見工業大学 |