ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "bd57f6a6-6c97-4ca1-80de-a33a4400c772"}, "_deposit": {"id": "6636", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "6636"}, "status": "published"}, "_oai": {"id": "oai:kitami-it.repo.nii.ac.jp:00006636", "sets": ["41"]}, "item_2_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "1989-03", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "2", "bibliographicPageEnd": "80", "bibliographicPageStart": "71", "bibliographicVolumeNumber": "20", "bibliographic_titles": [{"bibliographic_title": "北見工業大学研究報告"}]}]}, "item_2_description_14": {"attribute_name": "フォーマット", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "An outline of already reported scheduling methods which can satisfy environmental constraints and give maximum reliability is briefly described. This scheduling method is expanded to consider the minimum shut-down time of the thermal power units in this paper. To satisfy a constraint of the minimum shut-down time, start-stop schedules are modified to improve themselves so that the thermal units at least shut-down during the minimum shut-down time, or not shut-down at all. Using simulation results of a model power system, an usefulness of the proposed method is shown. Variations of the power supply probability and the computing time are investigated.", "subitem_description_type": "Abstract"}]}, "item_2_publisher_32": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "北見工業大学"}]}, "item_2_select_15": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Yoichi, NAKAMURA"}], "nameIdentifiers": [{"nameIdentifier": "33337", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Susumu, YAMASHIRO"}], "nameIdentifiers": [{"nameIdentifier": "33338", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-11-22"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "20-2-1.pdf", "filesize": [{"value": "4.3 MB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 4300000.0, "url": {"label": "20-2-1.pdf", "url": "https://kitami-it.repo.nii.ac.jp/record/6636/files/20-2-1.pdf"}, "version_id": "b32db9c8-1fa6-4b1f-a8a3-b6fd4b19e745"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-"}]}, "item_type_id": "2", "owner": "1", "path": ["41"], "permalink_uri": "https://kitami-it.repo.nii.ac.jp/records/6636", "pubdate": {"attribute_name": "公開日", "attribute_value": "2007-04-09"}, "publish_date": "2007-04-09", "publish_status": "0", "recid": "6636", "relation": {}, "relation_version_is_last": true, "title": ["Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-"], "weko_shared_id": 3}
  1. 紀要掲載論文
  2. 北見工業大学研究報告
  3. Vol.20

Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-

https://kitami-it.repo.nii.ac.jp/records/6636
https://kitami-it.repo.nii.ac.jp/records/6636
7f500188-ee89-4ea1-bb53-41b8e8f53089
名前 / ファイル ライセンス アクション
20-2-1.pdf 20-2-1.pdf (4.3 MB)
Item type 紀要論文 / Departmental Bulletin Paper(1)
公開日 2007-04-09
タイトル
タイトル Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-
言語
言語 eng
資源タイプ
資源 http://purl.org/coar/resource_type/c_6501
タイプ departmental bulletin paper
著者 Yoichi, NAKAMURA

× Yoichi, NAKAMURA

WEKO 33337

Yoichi, NAKAMURA

Search repository
Susumu, YAMASHIRO

× Susumu, YAMASHIRO

WEKO 33338

Susumu, YAMASHIRO

Search repository
抄録
内容記述タイプ Abstract
内容記述 An outline of already reported scheduling methods which can satisfy environmental constraints and give maximum reliability is briefly described. This scheduling method is expanded to consider the minimum shut-down time of the thermal power units in this paper. To satisfy a constraint of the minimum shut-down time, start-stop schedules are modified to improve themselves so that the thermal units at least shut-down during the minimum shut-down time, or not shut-down at all. Using simulation results of a model power system, an usefulness of the proposed method is shown. Variations of the power supply probability and the computing time are investigated.
書誌情報 北見工業大学研究報告

巻 20, 号 2, p. 71-80, 発行日 1989-03
フォーマット
内容記述タイプ Other
内容記述 application/pdf
著者版フラグ
値 publisher
出版者
出版者 北見工業大学
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 06:49:25.558354
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3