{"created":"2021-03-01T05:59:04.396994+00:00","id":6636,"links":{},"metadata":{"_buckets":{"deposit":"bd57f6a6-6c97-4ca1-80de-a33a4400c772"},"_deposit":{"id":"6636","owners":[],"pid":{"revision_id":0,"type":"depid","value":"6636"},"status":"published"},"_oai":{"id":"oai:kitami-it.repo.nii.ac.jp:00006636","sets":["7:15:41"]},"item_2_biblio_info_6":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1989-03","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"2","bibliographicPageEnd":"80","bibliographicPageStart":"71","bibliographicVolumeNumber":"20","bibliographic_titles":[{"bibliographic_title":"北見工業大学研究報告"}]}]},"item_2_description_14":{"attribute_name":"フォーマット","attribute_value_mlt":[{"subitem_description":"application/pdf","subitem_description_type":"Other"}]},"item_2_description_4":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"An outline of already reported scheduling methods which can satisfy environmental constraints and give maximum reliability is briefly described. This scheduling method is expanded to consider the minimum shut-down time of the thermal power units in this paper. To satisfy a constraint of the minimum shut-down time, start-stop schedules are modified to improve themselves so that the thermal units at least shut-down during the minimum shut-down time, or not shut-down at all. Using simulation results of a model power system, an usefulness of the proposed method is shown. Variations of the power supply probability and the computing time are investigated.","subitem_description_type":"Abstract"}]},"item_2_publisher_32":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"北見工業大学"}]},"item_2_select_15":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_select_item":"publisher"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"Yoichi, NAKAMURA"}],"nameIdentifiers":[{"nameIdentifier":"33337","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"Susumu, YAMASHIRO"}],"nameIdentifiers":[{"nameIdentifier":"33338","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2016-11-22"}],"displaytype":"detail","filename":"20-2-1.pdf","filesize":[{"value":"4.3 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"20-2-1.pdf","url":"https://kitami-it.repo.nii.ac.jp/record/6636/files/20-2-1.pdf"},"version_id":"b32db9c8-1fa6-4b1f-a8a3-b6fd4b19e745"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"eng"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"departmental bulletin paper","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-"}]},"item_type_id":"2","owner":"1","path":["41"],"pubdate":{"attribute_name":"公開日","attribute_value":"2007-04-09"},"publish_date":"2007-04-09","publish_status":"0","recid":"6636","relation_version_is_last":true,"title":["Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 15)* -Consideration of Minimum Shut-down Time Constraints-"],"weko_creator_id":"1","weko_shared_id":3},"updated":"2022-12-13T02:19:58.317678+00:00"}