ログイン
言語:

WEKO3

  • トップ
  • コミュニティ
  • ランキング
AND
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "1e98f2da-49f9-4db7-a04a-44c88c1bb170"}, "_deposit": {"id": "6536", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "6536"}, "status": "published"}, "_oai": {"id": "oai:kitami-it.repo.nii.ac.jp:00006536"}, "item_2_biblio_info_6": {"attribute_name": "\u66f8\u8a8c\u60c5\u5831", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "1982-11", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "1", "bibliographicPageEnd": "67", "bibliographicPageStart": "51", "bibliographicVolumeNumber": "14", "bibliographic_titles": [{"bibliographic_title": "\u5317\u898b\u5de5\u696d\u5927\u5b66\u7814\u7a76\u5831\u544a"}]}]}, "item_2_description_14": {"attribute_name": "\u30d5\u30a9\u30fc\u30de\u30c3\u30c8", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "\u6284\u9332", "attribute_value_mlt": [{"subitem_description": "In the restoration state of a power system, the time taken for a dropped generator to parallel in, and the cost of interruption of electrical service vary according to the, operating conditions just before the fault concerned, the amount of the load expected to be consumed during the fault and accidental factors. In this paper, the authors propose a method of determining\u3000the loads restoration sequence which takes into account the cost of interruption of electrical service, in which the above factors are considered. The authors develop a new calculating method which takes into account the distributions of these values. Comparing this method to the one previously presented which used fixed expected values\uff0cthe authors confirm that the former method is fully capable of determining the loads restoration sequence.", "subitem_description_type": "Abstract"}]}, "item_2_publisher_32": {"attribute_name": "\u51fa\u7248\u8005", "attribute_value_mlt": [{"subitem_publisher": "\u5317\u898b\u5de5\u696d\u5927\u5b66"}]}, "item_2_select_15": {"attribute_name": "\u8457\u8005\u7248\u30d5\u30e9\u30b0", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_creator": {"attribute_name": "\u8457\u8005", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Koichi, NARA"}], "nameIdentifiers": [{"nameIdentifier": "32971", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Susumu, YAMASHIRO"}], "nameIdentifiers": [{"nameIdentifier": "32972", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "\u30d5\u30a1\u30a4\u30eb\u60c5\u5831", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-11-22"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "14-1-5.pdf", "filesize": [{"value": "6.8 MB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 6800000.0, "url": {"label": "14-1-5.pdf", "url": "https://kitami-it.repo.nii.ac.jp/record/6536/files/14-1-5.pdf"}, "version_id": "2ae89456-b944-4f8a-a4b4-2c6bf74902d9"}]}, "item_language": {"attribute_name": "\u8a00\u8a9e", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "\u8cc7\u6e90\u30bf\u30a4\u30d7", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Determination of the Loads Restoration Sequence Taking into Account the Cost of Interruption Electrical Service (Consideration of the Deviation of the Cost of Interruptions of Electrical Service)", "item_titles": {"attribute_name": "\u30bf\u30a4\u30c8\u30eb", "attribute_value_mlt": [{"subitem_title": "Determination of the Loads Restoration Sequence Taking into Account the Cost of Interruption Electrical Service (Consideration of the Deviation of the Cost of Interruptions of Electrical Service)"}]}, "item_type_id": "2", "owner": "1", "path": ["7/15/35"], "permalink_uri": "https://kitami-it.repo.nii.ac.jp/records/6536", "pubdate": {"attribute_name": "\u516c\u958b\u65e5", "attribute_value": "2007-04-09"}, "publish_date": "2007-04-09", "publish_status": "0", "recid": "6536", "relation": {}, "relation_version_is_last": true, "title": ["Determination of the Loads Restoration Sequence Taking into Account the Cost of Interruption Electrical Service (Consideration of the Deviation of the Cost of Interruptions of Electrical Service)"], "weko_shared_id": 3}
  1. 紀要掲載論文
  2. 北見工業大学研究報告
  3. Vol.14

Determination of the Loads Restoration Sequence Taking into Account the Cost of Interruption Electrical Service (Consideration of the Deviation of the Cost of Interruptions of Electrical Service)

https://kitami-it.repo.nii.ac.jp/records/6536
bd683262-ef2c-4149-99f6-d91feeed2059
名前 / ファイル ライセンス アクション
14-1-5.pdf 14-1-5.pdf (6.8 MB)
Item type 紀要論文 / Departmental Bulletin Paper(1)
公開日 2007-04-09
タイトル
タイトル Determination of the Loads Restoration Sequence Taking into Account the Cost of Interruption Electrical Service (Consideration of the Deviation of the Cost of Interruptions of Electrical Service)
言語
言語 eng
資源タイプ
資源 http://purl.org/coar/resource_type/c_6501
タイプ departmental bulletin paper
著者 Koichi, NARA

× Koichi, NARA

WEKO 32971

Koichi, NARA

Search repository
Susumu, YAMASHIRO

× Susumu, YAMASHIRO

WEKO 32972

Susumu, YAMASHIRO

Search repository
抄録
内容記述タイプ Abstract
内容記述 In the restoration state of a power system, the time taken for a dropped generator to parallel in, and the cost of interruption of electrical service vary according to the, operating conditions just before the fault concerned, the amount of the load expected to be consumed during the fault and accidental factors. In this paper, the authors propose a method of determining the loads restoration sequence which takes into account the cost of interruption of electrical service, in which the above factors are considered. The authors develop a new calculating method which takes into account the distributions of these values. Comparing this method to the one previously presented which used fixed expected values,the authors confirm that the former method is fully capable of determining the loads restoration sequence.
書誌情報 北見工業大学研究報告

巻 14, 号 1, p. 51-67, 発行日 1982-11
フォーマット
内容記述タイプ Other
内容記述 application/pdf
著者版フラグ
値 publisher
出版者
出版者 北見工業大学
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 06:50:36.802713
Show All versions

Share

Mendeley CiteULike Twitter Facebook Print Addthis

Cite as

Export

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by CERN Data Centre & Invenio


Powered by CERN Data Centre & Invenio