一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第3報) -多地域制約の場合-
https://kitami-it.repo.nii.ac.jp/records/6527
https://kitami-it.repo.nii.ac.jp/records/65270e8b5dbd-5a7e-4935-88bf-e6d55309013a
名前 / ファイル | ライセンス | アクション |
---|---|---|
![]() |
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2007-04-09 | |||||
タイトル | ||||||
タイトル | 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第3報) -多地域制約の場合- | |||||
言語 | ja | |||||
言語 | ||||||
言語 | jpn | |||||
資源タイプ | ||||||
資源 | http://purl.org/coar/resource_type/c_6501 | |||||
タイプ | departmental bulletin paper | |||||
その他のタイトル | ||||||
その他のタイトル | Optimum Operation Scheduling under Constrained Supply of a Primal Energy and Constrained Environmental Pollution (Part 3) -in Case of Many Constraints- | |||||
言語 | en | |||||
著者 |
中村, 陽一
× 中村, 陽一× 山城, 迪 |
|||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 32939 | |||||
姓名 | Yoichi, NAKAMURA | |||||
言語 | en | |||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 32940 | |||||
姓名 | Susumu, YAMASHIRO | |||||
言語 | en | |||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | In the previous papers, we reported the optimum operation scheduling method which would satisfy the constraints both of supply of a primal energy and the environmental pollution. And some kinds of primal energy and some areas pollution were lumped respectively. In this paper, the pollutions are constrained at every area, and supplys of the energy are constrained at every kind of fuel. And we report the optimum operation scheduling method in case of this many constraints. In this paper, fundamentally, we take the Lagrange’s method of multiplier. And we use two assumptions by the reason that start-up and shut-down pattern of generator is discrete quantity. The first assumption is that we can ignore the change of Lagrange’s multipliers for supply or pollution constraints when one generator is started or stopped in one time interval. And the second assumption is that we can ignore the upper and lower limits of unit power only when we calculate the effect of the start or stop of generator. And then we report optimum pattern reserching method which reserches in ε range from approximate solution. We explain that computing time and memory domain determine this ε. Applying our method to the model system, we report the appropriateness of our method. | |||||
言語 | en | |||||
書誌情報 |
ja : 北見工業大学研究報告 巻 13, 号 2, p. 105-114, 発行日 1982-03 |
|||||
フォーマット | ||||||
内容記述タイプ | Other | |||||
内容記述 | application/pdf | |||||
著者版フラグ | ||||||
言語 | en | |||||
値 | publisher | |||||
出版者 | ||||||
出版者 | 北見工業大学 | |||||
言語 | ja |