WEKO3
アイテム
{"_buckets": {"deposit": "b95ba41e-a962-4359-9756-568333627acc"}, "_deposit": {"id": "6372", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "6372"}, "status": "published"}, "_oai": {"id": "oai:kitami-it.repo.nii.ac.jp:00006372", "sets": ["23"]}, "item_2_alternative_title_18": {"attribute_name": "その他のタイトル", "attribute_value_mlt": [{"subitem_alternative_title": "A Study of the Start-up Priority in the Start-up and Shutdown Problem of Thermal Units"}]}, "item_2_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "1975-11", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "1", "bibliographicPageEnd": "56", "bibliographicPageStart": "49", "bibliographicVolumeNumber": "7", "bibliographic_titles": [{"bibliographic_title": "北見工業大学研究報告"}]}]}, "item_2_description_14": {"attribute_name": "フォーマット", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": " The problem of start-up and shutdown of power units is a very important factor in the economic operation of power systems. In actual power system operation, the start-up priority method is used for this problem because of simplicity. When we strictly pursue the economic operation,the non-priority method is needed and the author has proposed one method of“non-priority\". In this paper,some discusion is given concerning the priority and non-priority methods about the economic operation pattern which is given by a simple model system analysis.", "subitem_description_type": "Abstract"}]}, "item_2_full_name_3": {"attribute_name": "著者別名", "attribute_value_mlt": [{"nameIdentifiers": [{"nameIdentifier": "32343", "nameIdentifierScheme": "WEKO"}], "names": [{"name": "YAMASHIRO, Susumu"}]}, {"nameIdentifiers": [{"nameIdentifier": "32344", "nameIdentifierScheme": "WEKO"}], "names": [{"name": "NAKAMURA, Yoichi"}]}]}, "item_2_publisher_32": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "北見工業大学"}]}, "item_2_select_15": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "山城, 迪"}], "nameIdentifiers": [{"nameIdentifier": "32341", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "中村, 陽一"}], "nameIdentifiers": [{"nameIdentifier": "32342", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-11-22"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "7-1-4.pdf", "filesize": [{"value": "3.0 MB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 3000000.0, "url": {"label": "7-1-4.pdf", "url": "https://kitami-it.repo.nii.ac.jp/record/6372/files/7-1-4.pdf"}, "version_id": "90b306a9-e799-4785-be8c-f06ca38003bb"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "jpn"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "火力発電機群の起動停止問題における起動優先順位に関する考察", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "火力発電機群の起動停止問題における起動優先順位に関する考察"}]}, "item_type_id": "2", "owner": "1", "path": ["23"], "permalink_uri": "https://kitami-it.repo.nii.ac.jp/records/6372", "pubdate": {"attribute_name": "公開日", "attribute_value": "2007-04-09"}, "publish_date": "2007-04-09", "publish_status": "0", "recid": "6372", "relation": {}, "relation_version_is_last": true, "title": ["火力発電機群の起動停止問題における起動優先順位に関する考察"], "weko_shared_id": 3}
火力発電機群の起動停止問題における起動優先順位に関する考察
https://kitami-it.repo.nii.ac.jp/records/6372
https://kitami-it.repo.nii.ac.jp/records/6372c757ba5c-7fc1-443e-9c1e-497ac58494ed
名前 / ファイル | ライセンス | アクション |
---|---|---|
7-1-4.pdf (3.0 MB)
|
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2007-04-09 | |||||
タイトル | ||||||
タイトル | 火力発電機群の起動停止問題における起動優先順位に関する考察 | |||||
言語 | ||||||
言語 | jpn | |||||
資源タイプ | ||||||
資源 | http://purl.org/coar/resource_type/c_6501 | |||||
タイプ | departmental bulletin paper | |||||
その他のタイトル | ||||||
その他のタイトル | A Study of the Start-up Priority in the Start-up and Shutdown Problem of Thermal Units | |||||
著者 |
山城, 迪
× 山城, 迪× 中村, 陽一 |
|||||
著者別名 | ||||||
識別子 | 32343 | |||||
識別子Scheme | WEKO | |||||
姓名 | YAMASHIRO, Susumu | |||||
著者別名 | ||||||
識別子 | 32344 | |||||
識別子Scheme | WEKO | |||||
姓名 | NAKAMURA, Yoichi | |||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | The problem of start-up and shutdown of power units is a very important factor in the economic operation of power systems. In actual power system operation, the start-up priority method is used for this problem because of simplicity. When we strictly pursue the economic operation,the non-priority method is needed and the author has proposed one method of“non-priority". In this paper,some discusion is given concerning the priority and non-priority methods about the economic operation pattern which is given by a simple model system analysis. | |||||
書誌情報 |
北見工業大学研究報告 巻 7, 号 1, p. 49-56, 発行日 1975-11 |
|||||
フォーマット | ||||||
内容記述タイプ | Other | |||||
内容記述 | application/pdf | |||||
著者版フラグ | ||||||
値 | publisher | |||||
出版者 | ||||||
出版者 | 北見工業大学 |