{"created":"2021-03-01T05:58:48.371454+00:00","id":6372,"links":{},"metadata":{"_buckets":{"deposit":"b95ba41e-a962-4359-9756-568333627acc"},"_deposit":{"id":"6372","owners":[],"pid":{"revision_id":0,"type":"depid","value":"6372"},"status":"published"},"_oai":{"id":"oai:kitami-it.repo.nii.ac.jp:00006372","sets":["7:15:23"]},"item_2_alternative_title_18":{"attribute_name":"その他のタイトル","attribute_value_mlt":[{"subitem_alternative_title":"A Study of the Start-up Priority in the Start-up and Shutdown Problem of Thermal Units"}]},"item_2_biblio_info_6":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1975-11","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"1","bibliographicPageEnd":"56","bibliographicPageStart":"49","bibliographicVolumeNumber":"7","bibliographic_titles":[{"bibliographic_title":"北見工業大学研究報告"}]}]},"item_2_description_14":{"attribute_name":"フォーマット","attribute_value_mlt":[{"subitem_description":"application/pdf","subitem_description_type":"Other"}]},"item_2_description_4":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":" The problem of start-up and shutdown of power units is a very important factor in the economic operation of power systems.  In actual power system operation, the start-up priority method is used for this problem because of simplicity.  When we strictly pursue the economic operation,the non-priority method is needed and the author has proposed one method of“non-priority\".  In this paper,some discusion is given concerning the priority and non-priority methods about the economic operation pattern which is given by a simple model system analysis.","subitem_description_type":"Abstract"}]},"item_2_full_name_3":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"32343","nameIdentifierScheme":"WEKO"}],"names":[{"name":"YAMASHIRO, Susumu"}]},{"nameIdentifiers":[{"nameIdentifier":"32344","nameIdentifierScheme":"WEKO"}],"names":[{"name":"NAKAMURA, Yoichi"}]}]},"item_2_publisher_32":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"北見工業大学"}]},"item_2_select_15":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_select_item":"publisher"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"山城, 迪"}],"nameIdentifiers":[{"nameIdentifier":"32341","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"中村, 陽一"}],"nameIdentifiers":[{"nameIdentifier":"32342","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2016-11-22"}],"displaytype":"detail","filename":"7-1-4.pdf","filesize":[{"value":"3.0 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"7-1-4.pdf","url":"https://kitami-it.repo.nii.ac.jp/record/6372/files/7-1-4.pdf"},"version_id":"90b306a9-e799-4785-be8c-f06ca38003bb"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"departmental bulletin paper","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"火力発電機群の起動停止問題における起動優先順位に関する考察","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"火力発電機群の起動停止問題における起動優先順位に関する考察"}]},"item_type_id":"2","owner":"1","path":["23"],"pubdate":{"attribute_name":"公開日","attribute_value":"2007-04-09"},"publish_date":"2007-04-09","publish_status":"0","recid":"6372","relation_version_is_last":true,"title":["火力発電機群の起動停止問題における起動優先順位に関する考察"],"weko_creator_id":"1","weko_shared_id":3},"updated":"2022-12-13T02:19:41.536220+00:00"}