停電損失を考慮した電力貯蔵装置の最適配置手法
https://kitami-it.repo.nii.ac.jp/records/6537
https://kitami-it.repo.nii.ac.jp/records/653736f41dd0-075e-4742-b036-cd46479c44d8
名前 / ファイル | ライセンス | アクション |
---|---|---|
![]() |
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2007-04-09 | |||||
タイトル | ||||||
タイトル | 停電損失を考慮した電力貯蔵装置の最適配置手法 | |||||
言語 | ja | |||||
言語 | ||||||
言語 | jpn | |||||
資源タイプ | ||||||
資源 | http://purl.org/coar/resource_type/c_6501 | |||||
タイプ | departmental bulletin paper | |||||
その他のタイトル | ||||||
その他のタイトル | The optimum Arrangement of Electric Energy Storage Facilities Taking into Account the Cost of Interruption of Electrical Service | |||||
言語 | en | |||||
著者 |
奈良, 宏一
× 奈良, 宏一× 仲村, 宏一× 中村, 陽一× 山城, 迪 |
|||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 32977 | |||||
姓名 | Koichi, NARA | |||||
言語 | en | |||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 32978 | |||||
姓名 | Koichi, NAKAMURA | |||||
言語 | en | |||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 32979 | |||||
姓名 | Yoichi, NAKAMURA | |||||
言語 | en | |||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 32980 | |||||
姓名 | Susumu, YAMASHIRO | |||||
言語 | en | |||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | In is expected that electrical energy storage facilities will be installed for improving load factor. Although there are no constraints for places to install, ordinarily, a site is considered as a possibility if it is one where transmission loss is minimized or where voltage or frequency can he easily controlled by setting up storage facilities. If storage facilities are installed at load buses, electric power would be maintained by supply from the storage facilities to the loads, even when outage should occur at the power source side of the buses in question. In this paper, the authors propose a method to determine the arrangement of storage facilities, for the objective of minimizing the cost of interruption of electrical service, assuming that the facilities are installed at load buses. The problem is formulated and solved by using the dynamic programming method. From the examples, it is confirmed that we can reduce the cost of interruption by the ratio of (maximum output)/(interrupted load), if the corresponding maximum capacity is 2?5 times larger than the mean outage duration time, and also it is confirmed that it is better to install larger storage facilities for larger capacity loads and for loads with larger mean outage duration time. | |||||
言語 | en | |||||
書誌情報 |
ja : 北見工業大学研究報告 巻 14, 号 1, p. 69-77, 発行日 1982-11 |
|||||
フォーマット | ||||||
内容記述タイプ | Other | |||||
内容記述 | application/pdf | |||||
著者版フラグ | ||||||
言語 | en | |||||
値 | publisher | |||||
出版者 | ||||||
出版者 | 北見工業大学 | |||||
言語 | ja |