WEKO3
アイテム
自動復旧操作のための事故区間推定論理*
https://kitami-it.repo.nii.ac.jp/records/6479
https://kitami-it.repo.nii.ac.jp/records/647910cb3a4b-4a67-4adf-90a9-d2f27e679ca9
名前 / ファイル | ライセンス | アクション |
---|---|---|
11-1-5.pdf (5.3 MB)
|
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2007-04-09 | |||||
タイトル | ||||||
タイトル | 自動復旧操作のための事故区間推定論理* | |||||
言語 | ||||||
言語 | jpn | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | departmental bulletin paper | |||||
その他のタイトル | ||||||
その他のタイトル | A Discriminative Logic of Faulted Elements for Power Systems Automatic Restrative Operation | |||||
著者 |
奈良, 宏一
× 奈良, 宏一 |
|||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 32754 | |||||
姓名 | Koichi, NARA | |||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | When power system’s constitutional elements are dropping off by a falut, it is necessary to find and remove the cause of the fault, and to restore the power system except faulted elements, because of the reduction of blacked out area and to maintain stability of the power system. So, in such cases, the faulted elements must be found immediately. If we want to find the faulted elements at the dispatching center, we must infer them from the state of protective relays and circuit brakers, after the faulted elements have been removed from the energized power system. (we can not obtain the information of the sequence of these apparatus’ action owing to the communication system.) Although some reports have been published by which we can infer the faulted elements from the state of the protective relays, a redesigning of existing protective relays must be necessary for practical application of these logics. So, the author proposes the discriminative logic of faulted elements by which we can infer a faulted elements from the state of existing protective relays. In this paper, at first, the author proposes a discriminative logic of faulted elements by which we can infer the faulted elements from the digital information that is made from the state of existing protective relays and circuit brakers after the fault. Next, the author confirms that the proposed logic is very effective for practical application, by simulating the logic using the data of real complex faults which have happened in some electric utility. | |||||
書誌情報 |
北見工業大学研究報告 巻 11, 号 1, p. 51-63, 発行日 1979-10 |
|||||
フォーマット | ||||||
内容記述タイプ | Other | |||||
内容記述 | application/pdf | |||||
著者版フラグ | ||||||
値 | publisher | |||||
出版者 | ||||||
出版者 | 北見工業大学 |