{"created":"2021-03-01T05:59:25.310756+00:00","id":6975,"links":{},"metadata":{"_buckets":{"deposit":"74d103ed-3852-4c9e-9f31-b0dd662ddc5e"},"_deposit":{"id":"6975","owners":[],"pid":{"revision_id":0,"type":"depid","value":"6975"},"status":"published"},"_oai":{"id":"oai:kitami-it.repo.nii.ac.jp:00006975","sets":["1:86"]},"author_link":["35241","35242","35243","35244","35245","35246","35235","35236","35237","35238","35239","35240"],"item_1646810750418":{"attribute_name":"出版タイプ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_3_alternative_title_198":{"attribute_name":"その他のタイトル","attribute_value_mlt":[{"subitem_alternative_title":"Study of a High Precision Machining and Assembly Production System Considering a Measuring Accuracy(Estimation of the Maximum Production Rate for a Relay Production System)"}]},"item_3_biblio_info_186":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"2004-12","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"700","bibliographicPageEnd":"3624","bibliographicPageStart":"3617","bibliographicVolumeNumber":"70","bibliographic_titles":[{"bibliographic_title":"日本機械学会論文集(C編) = Transactions of the Japan Society of Mechanical Engineers (c)@@@"}]}]},"item_3_description_184":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"In this paper we study a new estimation method for the maximum production rate in a high quality relay production system and an optimum operation method yieling the production rate. A relay is generally composed of two main parts (Base and Armature)with machining errors occurred in machining processes, so a‘Matching method' must be applied to the system to produce high quality relays. In the‘Matching method' one part is reprocessed using a tool selected according to an assembling error to reduce the assembling error, but the correct tool can not always be selected because the assembling error, which is calculated by machining errors, contains measuring errors. Measuring errors are occurred in measuring processes of machining errors. At first, we propose the estimation method for the maximum production rate and the optimum operation method under two conditions that tools are already set and that tools are not set yet. Next, the effects of machining and measuring accuracies on the maximum production rate and the optimum operation method are investigated. Results show that the proposed method can estimate the maximum production rate and the optimum operation method and that the machining and measuring accuracies both affect the production rate and the operation method.","subitem_description_type":"Abstract"}]},"item_3_full_name_183":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"35241","nameIdentifierScheme":"WEKO"}],"names":[{"name":"IYAMA, Toshirou","nameLang":"en"}]},{"nameIdentifiers":[{"nameIdentifier":"35242","nameIdentifierScheme":"WEKO"}],"names":[{"name":"MIZUNO, Masahiro","nameLang":"en"}]},{"nameIdentifiers":[{"nameIdentifier":"35243","nameIdentifierScheme":"WEKO"}],"names":[{"name":"UMEKI, Shion","nameLang":"en"}]},{"nameIdentifiers":[{"nameIdentifier":"35244","nameIdentifierScheme":"WEKO"}],"names":[{"name":"TAMAKI, Jynnichi","nameLang":"en"}]},{"nameIdentifiers":[{"nameIdentifier":"35245","nameIdentifierScheme":"WEKO"}],"names":[{"name":"HAYASHI, Mitsuaki","nameLang":"en"}]},{"nameIdentifiers":[{"nameIdentifier":"35246","nameIdentifierScheme":"WEKO"}],"names":[{"name":"SATO, Masaaki","nameLang":"en"}]}]},"item_3_publisher_212":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"日本機械学会"}]},"item_3_rights_192":{"attribute_name":"権利","attribute_value_mlt":[{"subitem_rights":"日本機械学会, 井山 俊郎, 水野雅裕, 梅木史恩, 田牧純一, 林 光明, 佐藤雅昭 , 日本機械学会論文集(C編), 70(700), 2004, 3617-3624."}]},"item_3_select_195":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_select_item":"publisher"}]},"item_access_right":{"attribute_name":"アクセス権","attribute_value_mlt":[{"subitem_access_right":"open access","subitem_access_right_uri":"http://purl.org/coar/access_right/c_abf2"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"井山, 俊郎","creatorNameLang":"ja"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"水野, 雅裕","creatorNameLang":"ja"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"梅木, 史恩","creatorNameLang":"ja"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"田牧, 純一","creatorNameLang":"ja"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"林, 光明","creatorNameLang":"ja"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"佐藤, 雅昭","creatorNameLang":"ja"}],"nameIdentifiers":[{}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2016-11-22"}],"displaytype":"detail","filename":"4986.pdf","filesize":[{"value":"8.3 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"4986.pdf","url":"https://kitami-it.repo.nii.ac.jp/record/6975/files/4986.pdf"},"version_id":"541cae6f-b096-421d-8b1b-4c3052b16a29"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"journal article","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"測定精度を考慮した高精度加工・組立生産システムに関する研究(リレー生産システムにおける最大生産率の推定)","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"測定精度を考慮した高精度加工・組立生産システムに関する研究(リレー生産システムにおける最大生産率の推定)","subitem_title_language":"ja"},{"subitem_title":"Study of a High Precision Machining and Assembly Production System Considering a Measuring Accuracy(Estimation of the Maximum Production Rate for a Relay Production System)","subitem_title_language":"en"}]},"item_type_id":"3","owner":"1","path":["86"],"pubdate":{"attribute_name":"PubDate","attribute_value":"2007-05-08"},"publish_date":"2007-05-08","publish_status":"0","recid":"6975","relation_version_is_last":true,"title":["測定精度を考慮した高精度加工・組立生産システムに関する研究(リレー生産システムにおける最大生産率の推定)"],"weko_creator_id":"1","weko_shared_id":-1},"updated":"2022-12-13T02:24:10.801190+00:00"}