ログイン
言語:

WEKO3

  • トップ
  • コミュニティ
  • ランキング
AND
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "172a1c75-8b7a-4e44-b459-76c821b33e34"}, "_deposit": {"id": "6626", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "6626"}, "status": "published"}, "_oai": {"id": "oai:kitami-it.repo.nii.ac.jp:00006626"}, "item_2_biblio_info_6": {"attribute_name": "\u66f8\u8a8c\u60c5\u5831", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "1988-03", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "2", "bibliographicPageEnd": "207", "bibliographicPageStart": "197", "bibliographicVolumeNumber": "19", "bibliographic_titles": [{"bibliographic_title": "\u5317\u898b\u5de5\u696d\u5927\u5b66\u7814\u7a76\u5831\u544a"}]}]}, "item_2_description_14": {"attribute_name": "\u30d5\u30a9\u30fc\u30de\u30c3\u30c8", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "\u6284\u9332", "attribute_value_mlt": [{"subitem_description": "The optimum start stop scheduling method is reported considering the constraints of both environmental pollution and the probability of power supply, because big and inflexible power stations are being built in spite of load increase and bad load factor of the power system. The proposed method controls the output power of two thermal stations so as to satisfy the line capacities and to make a schedule rapidly although the estimated schedule may not be strictly economical. The emission from each thermal station is controlled only when the whole system state is completely up in order to avoid huge estimations. If the power supply must be stopped to reduce the emission, then it is practically done only when the system includes some down elements. It is shown that the influence of the state probability is sufficiently little by variation of the length of the off service period of the thermal station and that the multistage choice process can be used. The usefulness of this method is concretely shown by estimating the optimum schedule of a model system. The estimating error is investigated by comparing results.", "subitem_description_type": "Abstract"}]}, "item_2_publisher_32": {"attribute_name": "\u51fa\u7248\u8005", "attribute_value_mlt": [{"subitem_publisher": "\u5317\u898b\u5de5\u696d\u5927\u5b66"}]}, "item_2_select_15": {"attribute_name": "\u8457\u8005\u7248\u30d5\u30e9\u30b0", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_creator": {"attribute_name": "\u8457\u8005", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Yoichi, NAKAMURA"}], "nameIdentifiers": [{"nameIdentifier": "33308", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Susumu, YAMASHIRO"}], "nameIdentifiers": [{"nameIdentifier": "33309", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "\u30d5\u30a1\u30a4\u30eb\u60c5\u5831", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-11-22"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "19-2-2.pdf", "filesize": [{"value": "4.7 MB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 4700000.0, "url": {"label": "19-2-2.pdf", "url": "https://kitami-it.repo.nii.ac.jp/record/6626/files/19-2-2.pdf"}, "version_id": "efda1a38-ac34-4c1a-bd22-7e98c49cf652"}]}, "item_language": {"attribute_name": "\u8a00\u8a9e", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "\u8cc7\u6e90\u30bf\u30a4\u30d7", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-", "item_titles": {"attribute_name": "\u30bf\u30a4\u30c8\u30eb", "attribute_value_mlt": [{"subitem_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-"}]}, "item_type_id": "2", "owner": "1", "path": ["7/15/40"], "permalink_uri": "https://kitami-it.repo.nii.ac.jp/records/6626", "pubdate": {"attribute_name": "\u516c\u958b\u65e5", "attribute_value": "2007-04-09"}, "publish_date": "2007-04-09", "publish_status": "0", "recid": "6626", "relation": {}, "relation_version_is_last": true, "title": ["Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-"], "weko_shared_id": 3}
  1. 紀要掲載論文
  2. 北見工業大学研究報告
  3. Vol.19

Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-

https://kitami-it.repo.nii.ac.jp/records/6626
6b3e389e-9d33-48fb-ad67-348fabdd67a4
名前 / ファイル ライセンス アクション
19-2-2.pdf 19-2-2.pdf (4.7 MB)
Item type 紀要論文 / Departmental Bulletin Paper(1)
公開日 2007-04-09
タイトル
タイトル Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-
言語
言語 eng
資源タイプ
資源 http://purl.org/coar/resource_type/c_6501
タイプ departmental bulletin paper
著者 Yoichi, NAKAMURA

× Yoichi, NAKAMURA

WEKO 33308

Yoichi, NAKAMURA

Search repository
Susumu, YAMASHIRO

× Susumu, YAMASHIRO

WEKO 33309

Susumu, YAMASHIRO

Search repository
抄録
内容記述タイプ Abstract
内容記述 The optimum start stop scheduling method is reported considering the constraints of both environmental pollution and the probability of power supply, because big and inflexible power stations are being built in spite of load increase and bad load factor of the power system. The proposed method controls the output power of two thermal stations so as to satisfy the line capacities and to make a schedule rapidly although the estimated schedule may not be strictly economical. The emission from each thermal station is controlled only when the whole system state is completely up in order to avoid huge estimations. If the power supply must be stopped to reduce the emission, then it is practically done only when the system includes some down elements. It is shown that the influence of the state probability is sufficiently little by variation of the length of the off service period of the thermal station and that the multistage choice process can be used. The usefulness of this method is concretely shown by estimating the optimum schedule of a model system. The estimating error is investigated by comparing results.
書誌情報 北見工業大学研究報告

巻 19, 号 2, p. 197-207, 発行日 1988-03
フォーマット
内容記述タイプ Other
内容記述 application/pdf
著者版フラグ
値 publisher
出版者
出版者 北見工業大学
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 06:49:43.591289
Show All versions

Share

Mendeley CiteULike Twitter Facebook Print Addthis

Cite as

Export

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by CERN Data Centre & Invenio


Powered by CERN Data Centre & Invenio