ログイン
言語:

WEKO3

  • トップ
  • コミュニティ
  • ランキング
AND
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "6e198535-0d00-416a-988f-7614b933c143"}, "_deposit": {"id": "6587", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "6587"}, "status": "published"}, "_oai": {"id": "oai:kitami-it.repo.nii.ac.jp:00006587"}, "item_2_biblio_info_6": {"attribute_name": "\u66f8\u8a8c\u60c5\u5831", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "1986-03", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "2", "bibliographicPageEnd": "178", "bibliographicPageStart": "171", "bibliographicVolumeNumber": "17", "bibliographic_titles": [{"bibliographic_title": "\u5317\u898b\u5de5\u696d\u5927\u5b66\u7814\u7a76\u5831\u544a"}]}]}, "item_2_description_14": {"attribute_name": "\u30d5\u30a9\u30fc\u30de\u30c3\u30c8", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "\u6284\u9332", "attribute_value_mlt": [{"subitem_description": "An optimum operation scheduling method is reported regarding a fault of the thermal units as probabilistic. 0ptimum operation is considered as which the reliability limit and the NO_x emission constraint can be economically satisfied. The reliability limit is satisfied by increasing kinds of the power supply states. The power supply is considered as possible only when every line\u2019s capacity is satisfied. A strict method and an approximate method are introduced to estimate the change of thermal output power after a unit fault. The strict method is a simple application of the economic load dispatch. The approximate method is an economical dispatch of the output power of a faulty unit using the demand supply balance. From model system simulations where the number of thermal units is 5, the estimating speed of the approximate method is shown to be 15 times faster than the strict one. Estimating error of the approximate results is also shown to be small. Line capacity is satisfied by modifying the economical power flow. The changed value of the thermal output power is estimated to satisfy the line capacity by using an exceeding flow value from the capacity. Many simulated results are shown applying the proposed method to a model system. It is concretely shown that the proposed method can estimate the optimum operation to satisfy the various reliability limits and the various emission constraints.", "subitem_description_type": "Abstract"}]}, "item_2_publisher_32": {"attribute_name": "\u51fa\u7248\u8005", "attribute_value_mlt": [{"subitem_publisher": "\u5317\u898b\u5de5\u696d\u5927\u5b66"}]}, "item_2_select_15": {"attribute_name": "\u8457\u8005\u7248\u30d5\u30e9\u30b0", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_creator": {"attribute_name": "\u8457\u8005", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Yoichi, NAKAMURA"}], "nameIdentifiers": [{"nameIdentifier": "33183", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Susumu, YAMASHIRO"}], "nameIdentifiers": [{"nameIdentifier": "33184", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "\u30d5\u30a1\u30a4\u30eb\u60c5\u5831", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-11-22"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "17-2-6.pdf", "filesize": [{"value": "3.4 MB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 3400000.0, "url": {"label": "17-2-6.pdf", "url": "https://kitami-it.repo.nii.ac.jp/record/6587/files/17-2-6.pdf"}, "version_id": "41baa720-9847-4c66-8ea0-047f7519ebf0"}]}, "item_language": {"attribute_name": "\u8a00\u8a9e", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "\u8cc7\u6e90\u30bf\u30a4\u30d7", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 8)* -A Consideratioin for Thermal Unit Security-", "item_titles": {"attribute_name": "\u30bf\u30a4\u30c8\u30eb", "attribute_value_mlt": [{"subitem_title": "Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 8)* -A Consideratioin for Thermal Unit Security-"}]}, "item_type_id": "2", "owner": "1", "path": ["7/15/38"], "permalink_uri": "https://kitami-it.repo.nii.ac.jp/records/6587", "pubdate": {"attribute_name": "\u516c\u958b\u65e5", "attribute_value": "2007-04-09"}, "publish_date": "2007-04-09", "publish_status": "0", "recid": "6587", "relation": {}, "relation_version_is_last": true, "title": ["Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 8)* -A Consideratioin for Thermal Unit Security-"], "weko_shared_id": 3}
  1. 紀要掲載論文
  2. 北見工業大学研究報告
  3. Vol.17

Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 8)* -A Consideratioin for Thermal Unit Security-

https://kitami-it.repo.nii.ac.jp/records/6587
a87dcdb9-0867-4479-a1e5-d39b0697273f
名前 / ファイル ライセンス アクション
17-2-6.pdf 17-2-6.pdf (3.4 MB)
Item type 紀要論文 / Departmental Bulletin Paper(1)
公開日 2007-04-09
タイトル
タイトル Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 8)* -A Consideratioin for Thermal Unit Security-
言語
言語 eng
資源タイプ
資源 http://purl.org/coar/resource_type/c_6501
タイプ departmental bulletin paper
著者 Yoichi, NAKAMURA

× Yoichi, NAKAMURA

WEKO 33183

Yoichi, NAKAMURA

Search repository
Susumu, YAMASHIRO

× Susumu, YAMASHIRO

WEKO 33184

Susumu, YAMASHIRO

Search repository
抄録
内容記述タイプ Abstract
内容記述 An optimum operation scheduling method is reported regarding a fault of the thermal units as probabilistic. 0ptimum operation is considered as which the reliability limit and the NO_x emission constraint can be economically satisfied. The reliability limit is satisfied by increasing kinds of the power supply states. The power supply is considered as possible only when every line’s capacity is satisfied. A strict method and an approximate method are introduced to estimate the change of thermal output power after a unit fault. The strict method is a simple application of the economic load dispatch. The approximate method is an economical dispatch of the output power of a faulty unit using the demand supply balance. From model system simulations where the number of thermal units is 5, the estimating speed of the approximate method is shown to be 15 times faster than the strict one. Estimating error of the approximate results is also shown to be small. Line capacity is satisfied by modifying the economical power flow. The changed value of the thermal output power is estimated to satisfy the line capacity by using an exceeding flow value from the capacity. Many simulated results are shown applying the proposed method to a model system. It is concretely shown that the proposed method can estimate the optimum operation to satisfy the various reliability limits and the various emission constraints.
書誌情報 北見工業大学研究報告

巻 17, 号 2, p. 171-178, 発行日 1986-03
フォーマット
内容記述タイプ Other
内容記述 application/pdf
著者版フラグ
値 publisher
出版者
出版者 北見工業大学
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 06:50:11.193156
Show All versions

Share

Mendeley CiteULike Twitter Facebook Print Addthis

Cite as

Export

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by CERN Data Centre & Invenio


Powered by CERN Data Centre & Invenio