{"created":"2021-03-01T05:58:57.847965+00:00","id":6528,"links":{},"metadata":{"_buckets":{"deposit":"63a9f409-4050-4893-84b9-30c7e370290c"},"_deposit":{"id":"6528","owners":[],"pid":{"revision_id":0,"type":"depid","value":"6528"},"status":"published"},"_oai":{"id":"oai:kitami-it.repo.nii.ac.jp:00006528","sets":["7:15:34"]},"item_2_alternative_title_18":{"attribute_name":"その他のタイトル","attribute_value_mlt":[{"subitem_alternative_title":"Optimum Operations Scheduling of Electric Power System Including the Pumping-up Power Stations (Part 2) -the Case of Transmission Loss Involving- "}]},"item_2_biblio_info_6":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1982-03","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"2","bibliographicPageEnd":"123","bibliographicPageStart":"115","bibliographicVolumeNumber":"13","bibliographic_titles":[{"bibliographic_title":"北見工業大学研究報告"}]}]},"item_2_description_14":{"attribute_name":"フォーマット","attribute_value_mlt":[{"subitem_description":"application/pdf","subitem_description_type":"Other"}]},"item_2_description_4":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"In the previous paper, we reported the optimum operation scheduling method for the pumping-up power stations disregarding of transmission loss. In this paper, we report the optimum operation scheduling method in case of transmission loss involving. When transmission loss is ignored, we can determine that the priority of the pumping-up power stations is equal to the total efficiency order. However, when transmission loss is involved, we must determine the optimum operation taking into account the incremental transmission loss. To be easy for calculation, we make some assumptions in this paper. With these assumptions and incremental transmission loss, we calculate the incremental fuel cost of electric power system in totality. And we report the optimum operation scheduling method using this total incremental fuel cost. Applying our method to the model system, we can certify that the priority of the pumping-up power stations is not always equal to the total efficiency order and the pumping-up power station near the heavy load is more economical than the far one in general","subitem_description_type":"Abstract"}]},"item_2_full_name_3":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"32943","nameIdentifierScheme":"WEKO"}],"names":[{"name":"Yoichi, NAKAMURA"}]},{"nameIdentifiers":[{"nameIdentifier":"32944","nameIdentifierScheme":"WEKO"}],"names":[{"name":"Susumu, YAMASHIRO"}]}]},"item_2_publisher_32":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"北見工業大学"}]},"item_2_select_15":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_select_item":"publisher"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"中村, 陽一"}],"nameIdentifiers":[{"nameIdentifier":"32941","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"山城, 迪"}],"nameIdentifiers":[{"nameIdentifier":"32942","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2016-11-22"}],"displaytype":"detail","filename":"13-2-3.pdf","filesize":[{"value":"3.2 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"13-2-3.pdf","url":"https://kitami-it.repo.nii.ac.jp/record/6528/files/13-2-3.pdf"},"version_id":"390fac75-db70-47ce-843c-89e6501412fe"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"departmental bulletin paper","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-"}]},"item_type_id":"2","owner":"1","path":["34"],"pubdate":{"attribute_name":"公開日","attribute_value":"2007-04-09"},"publish_date":"2007-04-09","publish_status":"0","recid":"6528","relation_version_is_last":true,"title":["揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-"],"weko_creator_id":"1","weko_shared_id":3},"updated":"2022-12-13T02:19:52.316044+00:00"}