ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "63a9f409-4050-4893-84b9-30c7e370290c"}, "_deposit": {"id": "6528", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "6528"}, "status": "published"}, "_oai": {"id": "oai:kitami-it.repo.nii.ac.jp:00006528", "sets": ["34"]}, "item_2_alternative_title_18": {"attribute_name": "その他のタイトル", "attribute_value_mlt": [{"subitem_alternative_title": "Optimum Operations Scheduling of Electric Power System Including the Pumping-up Power Stations (Part 2) -the Case of Transmission Loss Involving- "}]}, "item_2_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "1982-03", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "2", "bibliographicPageEnd": "123", "bibliographicPageStart": "115", "bibliographicVolumeNumber": "13", "bibliographic_titles": [{"bibliographic_title": "北見工業大学研究報告"}]}]}, "item_2_description_14": {"attribute_name": "フォーマット", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "In the previous paper, we reported the optimum operation scheduling method for the pumping-up power stations disregarding of transmission loss. In this paper, we report the optimum operation scheduling method in case of transmission loss involving. When transmission loss is ignored, we can determine that the priority of the pumping-up power stations is equal to the total efficiency order. However, when transmission loss is involved, we must determine the optimum operation taking into account the incremental transmission loss. To be easy for calculation, we make some assumptions in this paper. With these assumptions and incremental transmission loss, we calculate the incremental fuel cost of electric power system in totality. And we report the optimum operation scheduling method using this total incremental fuel cost. Applying our method to the model system, we can certify that the priority of the pumping-up power stations is not always equal to the total efficiency order and the pumping-up power station near the heavy load is more economical than the far one in general", "subitem_description_type": "Abstract"}]}, "item_2_full_name_3": {"attribute_name": "著者別名", "attribute_value_mlt": [{"nameIdentifiers": [{"nameIdentifier": "32943", "nameIdentifierScheme": "WEKO"}], "names": [{"name": "Yoichi, NAKAMURA"}]}, {"nameIdentifiers": [{"nameIdentifier": "32944", "nameIdentifierScheme": "WEKO"}], "names": [{"name": "Susumu, YAMASHIRO"}]}]}, "item_2_publisher_32": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "北見工業大学"}]}, "item_2_select_15": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "中村, 陽一"}], "nameIdentifiers": [{"nameIdentifier": "32941", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "山城, 迪"}], "nameIdentifiers": [{"nameIdentifier": "32942", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-11-22"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "13-2-3.pdf", "filesize": [{"value": "3.2 MB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 3200000.0, "url": {"label": "13-2-3.pdf", "url": "https://kitami-it.repo.nii.ac.jp/record/6528/files/13-2-3.pdf"}, "version_id": "390fac75-db70-47ce-843c-89e6501412fe"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "jpn"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-"}]}, "item_type_id": "2", "owner": "1", "path": ["34"], "permalink_uri": "https://kitami-it.repo.nii.ac.jp/records/6528", "pubdate": {"attribute_name": "公開日", "attribute_value": "2007-04-09"}, "publish_date": "2007-04-09", "publish_status": "0", "recid": "6528", "relation": {}, "relation_version_is_last": true, "title": ["揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-"], "weko_shared_id": 3}
  1. 紀要掲載論文
  2. 北見工業大学研究報告
  3. Vol.13

揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-

https://kitami-it.repo.nii.ac.jp/records/6528
https://kitami-it.repo.nii.ac.jp/records/6528
3788c924-2a96-44ed-a04a-7db11d5f77cf
名前 / ファイル ライセンス アクション
13-2-3.pdf 13-2-3.pdf (3.2 MB)
Item type 紀要論文 / Departmental Bulletin Paper(1)
公開日 2007-04-09
タイトル
タイトル 揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-
言語
言語 jpn
資源タイプ
資源 http://purl.org/coar/resource_type/c_6501
タイプ departmental bulletin paper
その他のタイトル
その他のタイトル Optimum Operations Scheduling of Electric Power System Including the Pumping-up Power Stations (Part 2) -the Case of Transmission Loss Involving-
著者 中村, 陽一

× 中村, 陽一

WEKO 32941

中村, 陽一

Search repository
山城, 迪

× 山城, 迪

WEKO 32942

山城, 迪

Search repository
著者別名
識別子 32943
識別子Scheme WEKO
姓名 Yoichi, NAKAMURA
著者別名
識別子 32944
識別子Scheme WEKO
姓名 Susumu, YAMASHIRO
抄録
内容記述タイプ Abstract
内容記述 In the previous paper, we reported the optimum operation scheduling method for the pumping-up power stations disregarding of transmission loss. In this paper, we report the optimum operation scheduling method in case of transmission loss involving. When transmission loss is ignored, we can determine that the priority of the pumping-up power stations is equal to the total efficiency order. However, when transmission loss is involved, we must determine the optimum operation taking into account the incremental transmission loss. To be easy for calculation, we make some assumptions in this paper. With these assumptions and incremental transmission loss, we calculate the incremental fuel cost of electric power system in totality. And we report the optimum operation scheduling method using this total incremental fuel cost. Applying our method to the model system, we can certify that the priority of the pumping-up power stations is not always equal to the total efficiency order and the pumping-up power station near the heavy load is more economical than the far one in general
書誌情報 北見工業大学研究報告

巻 13, 号 2, p. 115-123, 発行日 1982-03
フォーマット
内容記述タイプ Other
内容記述 application/pdf
著者版フラグ
値 publisher
出版者
出版者 北見工業大学
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 06:50:56.787208
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3