{"created":"2021-03-01T05:58:53.544890+00:00","id":6457,"links":{},"metadata":{"_buckets":{"deposit":"706a7002-f8aa-441c-8a02-b08609aeabc7"},"_deposit":{"id":"6457","owners":[],"pid":{"revision_id":0,"type":"depid","value":"6457"},"status":"published"},"_oai":{"id":"oai:kitami-it.repo.nii.ac.jp:00006457","sets":["7:15:31"]},"item_2_alternative_title_18":{"attribute_name":"その他のタイトル","attribute_value_mlt":[{"subitem_alternative_title":"Power Systems Automatic Restorative Operation with Over-load Removal Based on the Loop Closing    "}]},"item_2_biblio_info_6":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1978-11","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"1","bibliographicPageEnd":"75","bibliographicPageStart":"65","bibliographicVolumeNumber":"10","bibliographic_titles":[{"bibliographic_title":"北見工業大学研究報告"}]}]},"item_2_description_14":{"attribute_name":"フォーマット","attribute_value_mlt":[{"subitem_description":"application/pdf","subitem_description_type":"Other"}]},"item_2_description_4":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"In a power system, it is essential to restore the system as quickly as possible, when it is broken by a fault. So, it is desired that the automatic restorative operation will be put to practical use by developing a reliable restorative logical sequence. In this paper, an algorism by which the power system is restored as that of before fault, in restoring the faulted point at the last of the sequence, is proposed subject to that the faulted point is known. In case that over-load hahpened in the midst of the sequence, it is removed by closing the loop along the over-loaded apparatus. The good results of the simulation tests justified the algorism proposed.","subitem_description_type":"Abstract"}]},"item_2_full_name_3":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"32662","nameIdentifierScheme":"WEKO"}],"names":[{"name":"Koichi, NARA"}]},{"nameIdentifiers":[{"nameIdentifier":"32663","nameIdentifierScheme":"WEKO"}],"names":[{"name":"Susumu, YAMASHIRO"}]}]},"item_2_publisher_32":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"北見工業大学"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"奈良, 宏一"}],"nameIdentifiers":[{"nameIdentifier":"32660","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"山城, 迪"}],"nameIdentifiers":[{"nameIdentifier":"32661","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2016-11-22"}],"displaytype":"detail","filename":"10-1-7.pdf","filesize":[{"value":"4.6 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"10-1-7.pdf","url":"https://kitami-it.repo.nii.ac.jp/record/6457/files/10-1-7.pdf"},"version_id":"e9fc2b16-6145-41d0-8fe6-3b6cfa1a193a"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"departmental bulletin paper","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"ルーブ投入による過負荷解消を考慮した事故時自動復旧操作手法*","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"ルーブ投入による過負荷解消を考慮した事故時自動復旧操作手法*"}]},"item_type_id":"2","owner":"1","path":["31"],"pubdate":{"attribute_name":"公開日","attribute_value":"2007-04-09"},"publish_date":"2007-04-09","publish_status":"0","recid":"6457","relation_version_is_last":true,"title":["ルーブ投入による過負荷解消を考慮した事故時自動復旧操作手法*"],"weko_creator_id":"1","weko_shared_id":null},"updated":"2022-12-13T02:19:48.987896+00:00"}