揚水式発電所を含む電力系統の最適運用計画 (第1報)*
Optimum Operations Scheduling of Electric Power System Including the Pumping-up Power Stations (Part 1)
中村, 陽一
山城, 迪
application/pdf
In this paper, we consider the operation of pumping-up power stations such that load factor becomes higher, thermal power stations are operated as economically as possible, and the fuel of thermal power stations is saved. In the first place, we investigate the optimum operation of the power system including a pumping-up power station. In so doing, we consider what is optimum start-up and shut-down for thermal power stations and a pumping-up power station, and how is optimum dispatch to thermal power stations and a pumping-up power station. In the second place, we investigate optimum operation of the power system including some pumping-up power stations. In this time, we consider how is optimum dispatch to pumping-up power stations. Finally, we show the appropriateness of our method by applying it to a model system
北見工業大学
1981-03
jpn
departmental bulletin paper
https://kitami-it.repo.nii.ac.jp/records/6510
北見工業大学研究報告
12
2
181
189
https://kitami-it.repo.nii.ac.jp/record/6510/files/12-2-4.pdf
application/pdf
3.3 MB
2016-11-22